Poslao: 04 Dec 2021 23:15
|
offline
- djox
- djox
- Pridružio: 23 Nov 2010
- Poruke: 101974
|
Kenguri
Citat:Royal Australian Air Force armament technicians from No. 3 Squadron, load a new Australian manufactured Bomb Live Unit (BLU 111) configured as a Guided Bomb Unit (GBU-12) onto F-35A Lightning II at RAAF Base Williamtown, New South Wales on Oct. 11.
https://twitter.com/ryankakiuchan/status/1466694873667768323
|
|
|
Registruj se da bi učestvovao u diskusiji. Registrovanim korisnicima se NE prikazuju reklame unutar poruka.
|
|
|
Poslao: 08 Dec 2021 12:41
|
offline
- janezek67
- Počasni građanin
- Pridružio: 27 Dec 2007
- Poruke: 783
|
Vjerovatno če jih uzeti i Finci.
https://www.thedrive.com/the-war-zone/43392/finlan.....ter-report
Na kraju dođe nešto ovakvo - ako imaš dobre odnose sa Amrikancima i ti oni ne smetaju F35; ako očeš dobar avijon a se malo plašiš amerikanca ona Rafale. Za ove opcije trebaš puno para.
Ako štediš, onda su ti na izboru F16V ili Gripen
Na istoku F30 ili F35, za manje pare Mig 35.
Ako nemaš puno para, možda još FA 50 Golden Eagle, JF 17 te još kineski F2000G.
|
|
|
|
|
Poslao: 08 Dec 2021 18:19
|
offline
- Toni
- SuperModerator
- Pridružio: 18 Jun 2008
- Poruke: 31310
|
Izvadili su olupinu.
Citat:“Operations to recover the UK F-35 in the Mediterranean Sea have successfully concluded” and “there is no danger or compromise to sensitive equipment on the aircraft," a statement from the Ministry of Defense said, which was posted by The Sun newspaper in the United Kingdom. That outlet said that it had taken two weeks to locate the wreck on the seafloor and then another week to successfully bring it up to the surface.
https://www.thedrive.com/the-war-zone/43423/the-wr.....iterranean
|
|
|
|
Poslao: 08 Dec 2021 20:12
|
offline
- djox
- djox
- Pridružio: 23 Nov 2010
- Poruke: 101974
|
Japanac imao prinudno sletanje
Citat:An F-35A of Japan Air Self-Defense Force made an emergency landing at Hakodate Airport (HKD/RJCH) at 12:18 LT.
The Lightning II took off Misawa at 11:15 LT, and suffered unreported trouble at 11:58 LT while flying over the Sea of Japan, 190 km west of Misawa, with another F-35A (reg. 19-8725, c/n AX-25) which also landed at Hakodate.
No injuries were reported.
The runway of Hakodate was closed for ten minutes, and one commercial departure flight delayed a half hour.
https://twitter.com/nhk_news/status/14684297058755.....e%2F270338
|
|
|
|
|
|
Poslao: 10 Dec 2021 15:28
|
offline
- dragon986
- Legendarni građanin
- Pridružio: 02 Jun 2013
- Poruke: 3904
|
Napisano: 10 Dec 2021 13:50
Kao da smk i očekivali nešto drugo, jedino da licitiramo koliko su dobili u ofset poslovima.
Dopuna: 10 Dec 2021 15:28
Neki detalji ugovora iz finskih izvora…
Citat:Procurement Costs
The acquisition equals approximately 8.378 billion euros. The cost of multi-role fighters is 4.703 billion euros and air-to-air missiles AMRAAM and Sidewinder 754,6 million euros. Service equipment, spare and exchange parts, training and sustainment solutions, other related systems as well as sustainment and maintenance services until the end of 2030 cost 2,920 billion euros.
Operational facilities, aircraft hangars and storages as well as runway structures and infrastructure for the procured system will be constructed in Finland. This is based on national and international safety and security requirements. Construction costs, costs of industrial participation, personnel costs and other project costs amount to 777 million euros.
Additionally 823,8 million euros is reserved for the final optimised weapons package and to control future contract amendments. Part of the weaponry will be obtained at a later date as per the aircraft delivery schedule.
Citat:Procurement Package
The procurement object is 64 F-35A multi-role fighters in the newest, Block 4 -configuration. The procurement encompasses multi-role fighter weaponry. The offered F-35 package includes the following weapon types: AMRAAM, Sidewinder, SDB I and II, JDAM-family weaponry, JSM and JASSM-ER. The weaponry is to be procured within the programme funding availability by the end of the year 2035. The weapons package will be optimised during the procurement process, taking into account availability of the newest weapon types and changes in the operating environment. With optimised weapons procurement, the system's capability will be maximised in the Finnish operating environment and the F-35 system's life-cycle guaranteed for the longest feasible time.
A remarkable number of additional products and services to be acquired concurrently are related to the procurement of the fighter system and its use. These comprise the sustainment system including test equipment, tools, replaceable assembly and spare part services, as well as information systems, training systems and services, mission support systems and related services as well as the US Government Foreign Military Sales (FMS) procurement process related administrative services to be used. The procurement package also includes the fleet sustainment costs for the years 2025-2030.
Citat:Industrial Participation
The F-35 industrial participation offer met the requirements in quality and content. The main focus of the offered industrial participation is in direct industrial cooperation that will create significant independent maintenance capabilities. The industrial participation solution will develop credible knowhow in the domestic industry from the security of supply perspective and become significant in the national economy.
The key industrial participation projects include large-scale production of the F-35 front fuselage in Finland also for other users, production of structural components as well as equipment testing and maintenance capability. In addition, Finland has been offered an engine final assembly pro-ject for the Air Force aircraft.
The industrial participation's domestic employment impact will be 4500 and indirect impact 1500 person-workyears.
The industrial participation contract will be signed by the Ministry of Defence as well as Lockheed Martin and the engine manufacturer Pratt & Whitney.
https://valtioneuvosto.fi/en/-/the-lockheed-martin.....le-fighter
|
|
|
|
Poslao: 10 Dec 2021 17:15
|
offline
- poljoprivreda
- Legendarni građanin
- Pridružio: 26 Jun 2019
- Poruke: 3154
|
Mene zivo interesuje kako ce osetljiva struktura, sva ta elektronika i kompoziti da se ponasaju na krajnjem severu Evrope, narocito nakon 5-10 godina upotrebe.
|
|
|
|