Prvih 12 za RV Ceske proizvodice se u Italiji
Citat:At the end of his three-day visit to Italy, President Petr Pavel announced that the first 12 of 24 Lockheed Martin F-35 Lightning IIs will be built at the Cameri plant in Italy, which he personally visited.
The purchase of the 24 F-35s, worth 150 billion CZK (~$6.783 billion), was approved by the government based on a military recommendation at the end of September 2023.
On Tuesday, Petr Pavel held talks with his counterpart Sergio Mattarella and Prime Minister Giorgia Meloni in Rome, today he spoke in Lombardy at the Czech-Italian Business Forum and met with the President of the Lombardy region, Attilio Fontana.
Citat:The F-35 JPO, working with the 388th Fighter Wing, reconstructing the F-35 AF-211, an aircraft that encountered a nose landing-gear separation in June 2020.
The nose section of this aircraft is being replaced with the undamaged nose from AF-27, an F-35 that experienced a severe engine fire at Eglin AFB, Florida, in 2014.
https://twitter.com/TheDeadDistrict/status/1731021214330622206
Citat:An F-35C with an interesting mirror finish that landed on the USS Abraham Lincoln yesterday.
Such coverage is not the first time, but the public still does not have accurate answers.
https://twitter.com/front_ukrainian/status/1731056556882432170
stegonosa ::Meni je i dalje fascinantno da se avion prodaje bez motora a motor se računa zasebno u ponudi.
Da. Za kupnju jedne serije aviona su Ameri sklapali cca 10 naruđbi.
Samo da se ne zbroji koliko košta. E, kod belgijskog tendera pa to nije bilo moguće. I tada, 2018 godine, je to bilo skoro 190 miljona dolara po komadu. Tako, da je to sigurna sada avion za 200 miljona dolara.
A koliko su dale pojedine države za razvoj u tih dobrih 20 godina?
Lockheed Martin’s F-35 Lightning II, also commonly known as the Joint Strike Fighter, is about to undergo a largely classified facelift that promises to turn the technologically advanced aircraft into a far more capable fighter.
New upgrades include 17 new weapon systems, powerful new radar, expanded electronic warfare capabilities, powerful propulsion upgrades, and more — much of which remains tucked nearly behind the veil of mountains of classified funding.
sva ova nadogradnja na novo TR3 i Block 4 bi kostala oko 25 miliona po avionu!!
nije ni cudo da se ceka se pocne njihova proizvodnja pa da se tek onda narucuju novi.
jeste avion napredan u mnogo toga, i da se sva ta istrazivanja moraju naplatiti, i firme koje su ukljucenje u proizvodnju i razvoj da imaju profit, ali ovo je vec ne bezobrazno, nego bolesno.