Direktor uzimao pare, koncern otisao u dugove pa je drzava morala da ga spasava...
Translate
Citat:According to the investigation department of the FSB of the Russian Federation, the embezzlement incriminated by him was committed in 2014-2015. The Ministry of Defense then allocated 5.2 billion rubles to KTZ. for the design and production of prototypes of armored personnel carriers and infantry fighting vehicles under the code "Kurganets". It was supposed to manufacture light armored vehicles at the Kurgan Machine-Building Plant, which was part of the concern, and to equip them with armor and dynamic protection - at the Moscow Research Institute of Steel.
At the same time, part of the funds allocated for the armor - according to the investigation, 90 million rubles - disappeared.
The NII transferred the advance received as a loan to a non-engineering company, and after several more dubious transactions, the money ended up in the accounts of a small private firm that the FSB believes is affiliated with the three defendants in the case. They allegedly "cashed out, embezzled and used the funds at their own discretion."
The state contract for armored vehicles was thwarted, and in the fall of 2017, when it was planned to launch military vehicles in a series, it turned out that KTZ was mired in debt and could barely keep afloat. The concern owes about 80 billion rubles to VEB alone, and its total debt amounted to about 100 billion rubles.
The beginning of a series of proceedings in arbitration and civil courts put KTZ on the verge of bankruptcy, but the concern was eventually saved thanks to the intervention of the Russian government. The plants and institutes of the holding were transferred to the operational management of the state corporation Rostec, after which large-scale audits began in the divisions. According to their results, almost all the former heads of the concern were fired, and some also became defendants in criminal cases.
Original na ruskom https://www.kommersant.ru/doc/5534745
|