Vala ni meni više nisu jasni, posle su u tekstu dodali ovu rečenicu u kojoj se govori o projektu 20180 da ne ispunjava moderne zhteve:
Citat:However, a shipbuilding industry source told Kommersant that the Project 20180 ship "does not meet modern requirements" and a new class is therefore required.
Corvette (frigate) Project 20380
Developed in the Central Maritime Bureau "Almaz" (St. Petersburg). Designed to perform escort and strike missions in the near sea area, patrolling coastal waters, patrol service. Total displacement 2220 tons, length 104.5 meters, width 13 m, draft 7,95 m. The speed full speed to 27 knots, cruising range of 3500-4000 miles. Power diesel power plant of 24 thousand liters. with. (two diesel-diesel unit DDA-12000 - two engine 16D49 each).
Armament: missile system "Uranus", including 8 launchers, anti-ship missile 3M24 (range up to 130 km), 100-mm artillery plant A-190 and two 30-millimeter artillery guns are AK-630M, anti-aircraft missile and artillery system "dirk-M (on the new versions will install new corvette SAM missile 9M96), anti-torpedo complex "package", the helicopter. The crew of 99 employees.
February 27, 2008 in the RF Navy became the lead ship of the project - "Steregushchy." Currently under construction, four similar corvette. Navy announced an order for a total of 20 such ships.
"Savvy"
Construct Severnaya Verf. Serial No. 1002. Laid down 20 May 2003. Delivery of the Navy announced in 2010.
"Boyko
Construct Severnaya Verf. Serial No. 1003. Laid down 27 July 2005. Delivery of the Navy announced in 2011.
"Perfect"
Construct Amur Shipbuilding Plant (Komsomolsk-na-Amur, Khabarovsk Territory). Serial No. 2101. Laid down 30 June 2006. Delivery of the Navy announced in 2015.
"Steadfast"
Construct Severnaya Verf. Serial No. 1004. Laid down 10 November 2006. Delivery of the Navy announced in 2012.
------------------------------------------------------------------------------
Naval Weapons (search-and-transport ship) project 20180
Developed by the Central Maritime Bureau "Almaz". Designed for the transport, handling, towing, security testing of marine equipment and weapons, search and rescue operations. Total displacement 5400 tons, length about 100 m. The speed full speed to 14 knots.
Armament it. The crew of 65 persons.
Currently under construction, one ship of this project.
"The Star"
Construct a "Center for repair" Little Star ". Serial number 01218. Incorporated September 3, 2004, launched on December 20, 2007. Delivery of the Navy announced in 2009.
At the present time is running tests.
|