Rakete V-V

39

Rakete V-V

offline
  • Pridružio: 23 Nov 2010
  • Poruke: 101527

Meteor Missile On Target for Delivery This Year

Citat:MBDA has confirmed that production rounds of the Meteor long-range air-to-air missile are scheduled for delivery before year-end. However, MBDA managing director Steve Wadey would not disclose which air force will be the first to get the new missile, which MBDA UK claims represents a “step change in the air-to-air world.” AIN reported last year that French Rafale and Swedish Gripen fighters would be flying operational Meteors ahead of the four Eurofighter nations.

Arrow http://www.ainonline.com/aviation-news/ain-defense.....ivery-year



Registruj se da bi učestvovao u diskusiji. Registrovanim korisnicima se NE prikazuju reklame unutar poruka.
offline
  • Pridružio: 17 Sep 2010
  • Poruke: 24215

Ucilo u 4 CBP i PLS AB Lipeck




offline
  • član biblioteke
  • Pridružio: 18 Jul 2007
  • Poruke: 28763
  • Gde živiš: iznad smoga Beograda

Denelovi rani radovi

offline
  • Pridružio: 17 Sep 2010
  • Poruke: 24215

Nesto me zanima a to je ovo




sklop sa brojem 19 , ziro-platforma .Uloga ,namena ?

offline
  • član biblioteke
  • Pridružio: 18 Jul 2007
  • Poruke: 28763
  • Gde živiš: iznad smoga Beograda

Roleroni koji funkcionišu poput žiroskopa. Zaleću se pomoću gasova iz raketnog motora kroz cevčice. Ovde se vide na slici i cevčice i eleroni.



Sa prirastom brzine, kod rakete se javlja momenat valjanja. Ova raketa nije rotirajuća pa joj valjanje ne treba. Roleron stvara žiroskopski momenat i poništava valjanje, tako da raketa ostaje u željenom položaju.

offline
  • Toni  Male
  • SuperModerator
  • Pridružio: 18 Jun 2008
  • Poruke: 31247

Singapur kupuje 100 AIM-120 C-7 i 20 AIM-9X-2 sa pratecom opremom za 210 miliona $

Citat:The Government of Singapore has requested a possible sale of 100 AIM-120C7 Advanced Medium Range Air-to-Air Missiles (AMRAAM), AMRAAM Programmable Advanced System Interface Simulator (PASIS), 10 AMRAAM Spare Guidance Sections, 18 AN/AVS-9(V) Night Vision Goggles, H-764G with GEM V Selective Availability Anti-Spoofing Module (SAASM), Common Munitions Built-in -Test Reprogramming Equipment (CMBRE-Plus) in support of a Direct Commercial Sale of new F -15SG aircraft. Also included: containers, spare and repair parts, support equipment, tools and test equipment, publications and technical documentation, personnel training and training equipment, U.S. Government and contractor engineering, logistics, and technical support services, and other related elements of logistics and program support. The estimated cost is $210 million.


http://defense-studies.blogspot.com/2013/04/singap.....0-aim.html

offline
  • Pridružio: 17 Sep 2010
  • Poruke: 24215

Onako izbliza i u vecem formatu

Guided missile head for R-27R1 and R-27RE1 missiles




Rakete V-V ( i neke druge ) sa pogonom na nabojno-mlazni motor

Arrow http://www.dtic.mil/dtic/tr/fulltext/u2/p013518.pdf

offline
  • član biblioteke
  • Pridružio: 18 Jul 2007
  • Poruke: 28763
  • Gde živiš: iznad smoga Beograda

Zanimljiva GSN kod rakete R-73. Postoji još samo jedna takva. Znate li možda čija i zašto su posebne?

offline
  • RJ 
  • SuperModerator
  • Gavrilo Milentijević
  • Komandir stanice milicije Gornje Polje
  • Pridružio: 12 Feb 2005
  • Poruke: 36011
  • Gde živiš: ovalni kabinet

Kineski Sidewinder - modeli PL-1 i PL-2





offline
  • Pridružio: 23 Nov 2010
  • Poruke: 101527

Napisano: 14 Jun 2013 16:03

Citat:Saab advances Meteor missile trials with Gripen
By Robert Hewson
6/13/2013

Sweden is about to start a new round of airborne firings with the MBDA Meteor missile to support the weapon's final integration on Swedish Air Force JAS 39C/D Gripens.

Two missile launches will be conducted by Saab in June and a further three are planned for next year. After two shots by the Saab flight test team in 2014, the fifth and final launch will be conducted by Sweden's Defence Materiel Administration (FMV).

These integration firings are part of the capabilities clearance plan for the next standard of Gripen operational software, known as MS20. Development work for MS20 will be completed in 2014, with the first upgraded aircraft due to enter Swedish service by late 2014 or perhaps early 2015. Along with the Meteor, MS20 will qualify other new weapons for the Gripen.

The Meteor shots will be conducted by Saab's Gripen test aircraft 39-6 at the Vidsel ranges in Sweden. The last Meteor firing by a Gripen was in October 2010. At that time it was hoped that Meteor integration would be completed in 2013, but since then delays in software development for the MS19 standard saw the schedule slip into 2014.


Arrow http://www.janes.com/products/janes/defence-securi.....l=business

Dopuna: 16 Jun 2013 14:01

Oman i Saudi Arabija kupuju AIM-120C-7

Arrow http://www.menafn.com/16ee9b5d-aff6-4ae3-b90d-2944.....b?src=main

Ko je trenutno na forumu
 

Ukupno su 843 korisnika na forumu :: 3 registrovanih, 0 sakrivenih i 840 gosta   ::   [ Administrator ] [ Supermoderator ] [ Moderator ] :: Detaljnije

Najviše korisnika na forumu ikad bilo je 3195 - dana 09 Nov 2023 14:47

Korisnici koji su trenutno na forumu:
Korisnici trenutno na forumu: 4channer, ArchaBasha, nemkea71